{"id":3176,"date":"2020-08-06T09:18:19","date_gmt":"2020-08-06T07:18:19","guid":{"rendered":"https:\/\/kabelverlegung-tiefbau.de\/drainagerohrverlegung\/"},"modified":"2020-10-16T11:42:41","modified_gmt":"2020-10-16T09:42:41","slug":"drainage-pipe-laying","status":"publish","type":"post","link":"https:\/\/kabelverlegung-tiefbau.de\/drainage-pipe-laying\/","title":{"rendered":"Drainage pipe laying with trench cutters"},"content":{"rendered":"
Whether drainage pipe laying or cable construction, our „Lingener Baumaschinen“ machines are up to the tasks you have to cope with on your construction site. Through simple operation and imaginative technology, our machines are able to enable you to work effectively. Whether it is the laying of drainage pipes on a sports field or the fibreglass expansion in the city centre. Or would you prefer to attach your machine to an excavator to carry out track work? No problem, with us you will find the right machine for your job! Both self-propelled and mounted milling machines are part of our range, so we can offer our customers a perfect choice. Whether small jobs or large projects, we will find the right machine for you, and if it has to be something special, we will also find a solution for this, as we have already built several machines to customer specifications.<\/p>\r\n
The drainage pipes running longitudinally across the square, the so-called suction cups, are laid with a gradient. They lead the collected rainwater falling on the square to the collectors running around the square. The collectors transport the excess water by means of the pipes to a canal drain, a receiving watercourse or a central infiltration, called a ditch. The drainage ditches are cut into the ground with a trench cutter using laser control on a gentle slope. The next step is to lay the drainage pipe, the so-called suction pipe, in the trench. The trench is then filled with filter-stable rock, e.g. gravel, up to the lower edge of the drainage layer. We use a self-developed attachment for filling the drainage trenches, which ensures that the drainage pipe lies centrally in the trench and is thus completely surrounded by filter-stable material. Finally, the trench is compacted to prevent later dislocation. To prevent silting, we mainly use gravel that has been tested for filter stability.<\/p>\r\n